RUG HOOKING BLOG

About Me

My photo
I'm a mother of four grandmother of seven and great grandmother of three. I live with my husband in the house that we built with the help of my brothers and will have been married for 57 years this February.

Monday, March 5, 2012

I'VE BEEN UP THE LADDER, I THINK BETTER UP THERE...

I've been promising update photos of the renovations and finally I got some to show. Our friend was supposed to give me three days worth of his work doing renovation in my bathroom. I had paid $600.00 at the Church auction a year ago in February 2011 for his work. He offered his work and the church got the money and he was getting nothing. That was his contribution. The poor guy was so busy all year and I told him that I wasn't in a hurry and not to worry about it.


                                   The new stairs



                                             View from upstairs

When he came in my house a few weeks ago and saw the stairs without a railing he was concerned about our safety and I told him that it was my next project.  I told him that I had wanted a nice oak stairs with a banister when the house was built but when I came to see the work, someone had already built a plywood stairs which was to be covered with carpet.  I was upset but didn't say anything at the time. My husband had bartered with an ironsmith to have an iron railing for a side of beef.  If you have been following my blog you know that when the carpet was removed I painted the stairs and the iron railing didn't fit anymore and was never replaced until now.


              
                                              The old stairs

Our friend said, I'll built you a nice oak stairs and I said," Oh great, I'll pay you". He said that he would give me a little bit more than three days of his work. I told him, "No, I will pay you for the work if you want to built the stairs.

He put three coats of Polyurethane and use a power sanding tool to sand in between coats. Today I uses some fine steel wool to sand all the wood and vacuumed and used a tact cloth to remove the fine dust but didn't had enough time to put on the 4th coat. I'll do that tomorrow.

This evening I finished removing the rest of the vinyl wallpaper in the bathroom and will paint the ceiling and the walls another day. The bathroom is not finished and we will finish it ourselves.


I love this type of tap that regulate the water temperature even when someone flushes the toilet you don't get a change of temperature to startle you.



         A nice large shower head with lots of pressure.


                              A nice ceramic corner shelf for soap and shampoo.

  
                              I love this ceramic tile floor.
The  sink and taps and the toilet are  installed but the tank is not installed yet.
There is still lots of work to do like install the light fixture, towel bar, toilet paper holder, mirror, knobs and hinges, sanding the cabinet and priming and painting the shelves, painting the ceiling and fan,painting the trim and door,  hanging  a few pictures on the wall maybe.

Tomorrow is another day. Thanks for stopping by my blog and for laving a comment.  I much appreciate it. I hope that you have a nice March break.  JB